by taku_eng | Jul 10, 2019
Project Description The North Slope Borough’s (NSB) remote Walakpa Gas Field was powered by three 125kW Waukesha generators that had reached end of life and needed to be replaced. The NSB decided to replace the three generators with Capstone Turbines – C65 65kW...